Plan for the Workload You Need to Run
An AI training cluster, an inference platform and a research computing environment may all need different infrastructure. Hardware choices affect rack loading, power distribution, heat removal and network design. The space available today matters, but so does the facility’s ability to accommodate the next stage of your project.
We begin by looking at the equipment you intend to deploy, its expected power draw, cooling requirements and growth plans. That gives you a clearer basis for conversations with operators and suppliers. It also helps distinguish between capacity that is available in principle and capacity that can be delivered to your equipment, on your timetable.
As an independent IT management consultancy, Colocentric brings together technical planning and access to a network of data centre providers. Our role is to help you ask the right questions, compare credible options and make decisions that suit the workload.

Assess Power, Cooling and Physical Capacity Together
High-density infrastructure cannot be assessed on floor space alone. An apparently suitable location may still need further checks on usable power per rack, electrical resilience, cooling distribution, equipment weight or the route for future expansion.
Colocentric can help establish the information a prospective facility needs to provide before it reaches your shortlist. That may include the power available to each rack, the provider’s approach to resilient supply, the cooling capacity assigned to the deployment and any work required before installation. We can also consider practical details such as delivery access, rack dimensions, maintenance space and the responsibilities of each party.
The aim is a specification that reflects how your infrastructure will actually operate. Our technical support and planning services can assist when a project involves several providers, specialist equipment or a move from an existing environment.

Choose a Cooling Approach That Fits the Hardware
Cooling is often a deciding factor in an AI deployment. Depending on the equipment and facility, an appropriate solution may involve optimised air cooling, direct-to-chip liquid cooling, immersion cooling or a combination of methods. The right choice depends on the hardware, the heat it produces and the services the facility can support.
Colocentric can help you examine cooling options early, before a site or equipment choice limits what is possible. That includes checking how a proposed solution connects with the facility, who maintains each part of the system and how the arrangement affects future changes to the deployment.
For organisations considering liquid-based approaches, we can discuss our immersion cooling solutions and assess whether they suit the equipment and setting. Cooling technologies should be evaluated against the full project brief, including compatibility, operating requirements and commercial terms.

Build Connectivity Into the Decision
Compute performance depends on how systems communicate. An AI environment may need substantial connectivity within a cluster, reliable links to storage and a clear path to users, cloud services or other company sites.
We help clients bring network requirements into the facility selection process. This can include reviewing carrier choice, fibre availability, routes between locations and the division of responsibilities between the operator, network provider and your own team. Where network design is critical, identifying a suitable facility and a viable connection strategy should happen together.
Colocentric’s global provider relationships can support projects with requirements beyond a single UK site. The available services, performance and commercial arrangements still need to be confirmed for each proposed location.
Consider Energy Use Alongside Performance
A high-density deployment should be planned with a clear view of its ongoing energy use. The power consumed by the IT equipment is only part of the picture; cooling and supporting systems also affect the facility’s overall performance and cost.
Our data centre energy efficiency services can help organisations examine power use, cooling choices and opportunities to improve an existing environment. For a new project, we can help make energy performance a useful comparison point when assessing providers. Any projected savings should be tested against the proposed design and operating conditions.


How Colocentric Supports an AI Infrastructure Project
We start by understanding what you need to deploy, where it needs to operate and what may change over time. From there, we help define the technical brief, identify relevant providers and review proposed solutions against your priorities.
Our involvement can extend through supplier discussions, project planning and implementation support. The scope depends on the project: you may need an initial assessment of available options or continued help coordinating a more complex deployment.
With experience across colocation, telecommunications and specialist data centre technologies, Colocentric can connect the different parts of the decision. Learn more about our consultancy or contact us with your proposed workload and timescale.
Frequently Asked Questions
AI infrastructure can concentrate substantial compute capacity into a small number of racks. That changes the questions you need to ask about power delivery, heat removal, equipment weight and connectivity. The exact requirements depend on the hardware and how it will be used. Colocentric helps you document those needs before approaching facilities, so you can compare proposals against the same project brief instead of relying on broad descriptions such as “AI ready”.
No. The cooling approach should follow the equipment specification and the facility’s capabilities. Some deployments can use air cooling, while others may require direct-to-chip or immersion cooling to manage their thermal load. A facility also needs to support the chosen system in practice, including its connections, maintenance and operating procedures. We can help you assess those factors before you commit to a location or cooling technology.
Possibly, but it requires a detailed assessment. Available floor space does not establish whether the site has sufficient usable power, appropriate cooling or the physical layout needed for the equipment. There may also be a difference between an upgrade that works for an initial deployment and one that supports planned growth. Colocentric can help review the requirements and explore whether an existing site, an adapted environment or a new provider is the better fit.
Yes. We can use your equipment specification, location preferences and deployment timescale to identify relevant providers and examine their proposals. Our role is to help you assess whether a facility’s available services match the workload. We do not assume that every site advertised for AI can support every hardware configuration; power, cooling, connectivity and installation arrangements need to be confirmed with the provider.
Future capacity should be part of the initial brief, even if the first installation is small. A provider may be able to accommodate your opening deployment but require additional work or a different space for later phases. Defining likely growth gives you an opportunity to discuss expansion routes, lead times and contractual options before the first equipment is installed. Those plans can be reviewed as your hardware choices and workload become clearer.
Yes. Colocentric works with international data centre and telecommunications contacts. We can help organisations assess options across different markets and coordinate the questions that matter for each proposed location. Facility availability, connectivity, technical capacity and contractual terms vary by site, so each location should be evaluated against the same core requirements while accounting for local needs.
Still have questions?
Get in touch with our friendly and experienced team to discuss your printing requirements.
Get In touch
